Atal Tunnel, Rohtang
A 9.02 km highway tunnel beneath the Rohtang Pass, linking Manali with Lahaul-Spiti all year round.
Photo: Jagseer S Sidhu · CC BY-SA 4.0
Prior-role experience. The projects and credentials presented represent the professional experience of Devstrat's leadership in previous roles. They are not represented as projects executed by Devstrat Private Limited.
Overview
The Atal Tunnel runs beneath the Rohtang Pass, giving the Lahaul-Spiti valley all-weather road access and cutting travel time by up to four hours.
Prof. (Dr.) H. R. Yadav served as advisor to the Border Roads Organisation, nominated by DMRC.
Engineering challenges
- Himalayan geology: schist, gneiss, phyllite and quartzite with faults
- Seri Nala fault zone with water ingress above 100 l/s
- Ventilation and fire safety along a 9 km bore at altitude
Photo gallery
Atal Tunnel, Rohtang in pictures
Photos are openly licensed images from Wikimedia Commons, used under the licence shown with each photo. They are not Devstrat's own photographs. All photo credits
Technical case study

Technical data: SMEC project information; Indian Infrastructure, December 2020.
Related experience
Delhi Metro Phase I, Line 2 (underground)
- ~11 km · Underground length
- 10 · Underground stations, plus depot
- 8–9 months · Commissioned ahead of schedule
Delhi Airport Express Line
- ~11 km · Bored, NATM and cut-and-cover tunnels
- 4 · Underground stations
- ₹1,480 Cr+ · Underground works supervised
Delhi–Alwar & Delhi–Panipat RRTS
- ~107 km · Delhi–Alwar corridor
- ~103 km · Delhi–Panipat corridor
- 31 · Stations, 8 underground