Namo Bharat train at Meerut South RRTS station.
RRTS

Delhi–Alwar & Delhi–Panipat RRTS

Regional Rapid Transit corridors at semi-high speed across the National Capital Region.

National Capital Region Technical Head – Planning, Design & Execution

Photo: Ravi Dwivedi · CC BY-SA 4.0

Prior-role experience. The projects and credentials presented represent the professional experience of Devstrat's leadership in previous roles. They are not represented as projects executed by Devstrat Private Limited.

Overview

The Regional Rapid Transit System links Delhi with surrounding cities at semi-high speed. The Delhi–Alwar and Delhi–Panipat corridors together cover about 210 km.

Prof. (Dr.) H. R. Yadav was Technical Head – Planning, Design and Execution at NCRTC for these two corridors.

Engineering challenges

  • Planning semi-high-speed alignments through growing urban areas
  • Long underground sections, ~47 km in total
  • Integrating with existing rail, metro and road networks

Photo gallery

Photos show Namo Bharat trains on the operating Delhi–Meerut RRTS corridor, to illustrate the RRTS system; they are not of the Delhi–Alwar or Delhi–Panipat corridors.

Photos are openly licensed images from Wikimedia Commons, used under the licence shown with each photo. They are not Devstrat's own photographs. All photo credits

Discuss your infrastructure project

Tell us about the asset and the stage it is at — feasibility, DPR, design review, construction support or monitoring. We will set up a scoping discussion with the right engineers.