Mumbai–Ahmedabad High-Speed Rail
India's first high-speed rail corridor, including the country's first undersea rail tunnel beneath Thane Creek.
Photo: Rehman Abubakr · CC BY-SA 4.0
Prior-role experience. The projects and credentials presented represent the professional experience of Devstrat's leadership in previous roles. They are not represented as projects executed by Devstrat Private Limited.
Overview
The Mumbai–Ahmedabad corridor is India's first high-speed rail line. At its Mumbai end, a ~21 km tunnel runs from Bandra Kurla Complex to Shilphata, including about 7 km beneath Thane Creek — India's first undersea rail tunnel.
Prof. (Dr.) H. R. Yadav worked on the corridor's feasibility study and Detailed Project Report, including the tunnel beneath Thane Creek, during his time with RVNL.
Engineering challenges
- Tunnelling beneath a tidal creek
- Very large-diameter TBM drives in mixed ground
- Transition from TBM to NATM towards the Shilphata portal
Photo gallery
Mumbai–Ahmedabad HSR in pictures
Photos show Thane Creek, the setting of the undersea tunnel section.
Photos are openly licensed images from Wikimedia Commons, used under the licence shown with each photo. They are not Devstrat's own photographs. All photo credits
Technical case study
Technical data: NHSRCL press releases.
Related experience
Delhi Metro Phase I, Line 2 (underground)
- ~11 km · Underground length
- 10 · Underground stations, plus depot
- 8–9 months · Commissioned ahead of schedule
Delhi Airport Express Line
- ~11 km · Bored, NATM and cut-and-cover tunnels
- 4 · Underground stations
- ₹1,480 Cr+ · Underground works supervised
Delhi–Alwar & Delhi–Panipat RRTS
- ~107 km · Delhi–Alwar corridor
- ~103 km · Delhi–Panipat corridor
- 31 · Stations, 8 underground