Overview

The Mumbai–Ahmedabad corridor is India's first high-speed rail line. At its Mumbai end, a ~21 km tunnel runs from Bandra Kurla Complex to Shilphata, including about 7 km beneath Thane Creek — India's first undersea rail tunnel.

Prof. (Dr.) H. R. Yadav worked on the corridor's feasibility study and Detailed Project Report, including the tunnel beneath Thane Creek, during his time with RVNL.

Engineering challenges

  • Tunnelling beneath a tidal creek
  • Very large-diameter TBM drives in mixed ground
  • Transition from TBM to NATM towards the Shilphata portal

Photo gallery

Photos show Thane Creek, the setting of the undersea tunnel section.

Photos are openly licensed images from Wikimedia Commons, used under the licence shown with each photo. They are not Devstrat's own photographs. All photo credits

Technical case study

Tunnel alignment · schematic, not to scale Schematic of the BKC to Shilphata tunnel: about 16 km by TBM from BKC to Sawli with about 7 km beneath Thane Creek, then about 5 km by NATM to the Shilphata portal. Thane Creek · ~7 km undersea BKCUnderground station VikhroliShaft Sawli, GhansoliShaft ShilphataTunnel portal TBM · ~16 kmNATM · ~5 km
~21 kmTunnel sectionBKC to Shilphata, Maharashtra
~7 kmUndersea stretchBeneath Thane Creek
~16 kmTBM sectionBKC to Sawli (Ghansoli)
~5 kmNATM sectionTowards the Shilphata portal
13.6 mTBM cutterheadLargest TBMs for rail tunnelling in India (per NHSRCL)
Ø 13.1 mCross-sectionSingle tube carrying up and down tracks
25–65 mTunnel depthDeepest point ~114 m below Parsik Hill

Technical data: NHSRCL press releases.

Discuss your infrastructure project